VISISTREAM FOR / 2.2
Public Transport
Travel information where it is needed.
Build channels for timetables, routes, changes and services, with agreed sources and update arrangements.
Let's talk about your business ↗
Equipped stops, ticket offices and waiting areas.
Graphics, videos, messages and content scheduling.
Commissioned production, a dedicated channel or ongoing management.
SEE IT TO PICTURE IT
A screen,
in your context.
Two static layouts to explore content hierarchy. Graphics, dimensions, languages and information can be customised.
The next departure
Demo route 12 · Central → Station. Scheduled departure at 10:45. The screen complements timetables, routes and information from the operator.
A day of communication
At opening time, the channel presents general information. During the day, the schedule alternates departure times, route, destination and stop, delays. At the end of the scheduled time slot, the next set of content takes over.
When information changes
The coordinator updates the content and defines its validity. The screens included in the project receive the message; its title and summary help distinguish the update from routine information.
Service information
The information point is open until 18:00. Route changes are published with a date, time slot and directions approved by the operator.
ALL APPLICATIONS FOR THIS SECTOR
15 ways to
communicate better.
Each application describes a need, a service approach and a content example. Open the cards relevant to your business.
01Departure times
+
Content focused on “Departure times”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Departure times
Departure times. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.02Route, destination and stop
+
Content focused on “Route, destination and stop”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Route, destination and stop
Route, destination and stop. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.03Delays
+
Content focused on “Delays”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Delays
Delays. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.04Diversions
+
Content focused on “Diversions”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Diversions
Diversions. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.05Cancelled services
+
Content focused on “Cancelled services”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Cancelled services
Cancelled services. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.06Replacement services
+
Content focused on “Replacement services”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Replacement services
Replacement services. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.07Strikes
+
Content focused on “Strikes”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Strikes
Strikes. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.08Accessibility for people with disabilities
+
Content focused on “Accessibility for people with disabilities”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Accessibility for people with disabilities
Accessibility for people with disabilities. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.09Travel ticket validity
+
Content focused on “Travel ticket validity”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Travel ticket validity
Travel ticket validity. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.10Subscription campaigns
+
Content focused on “Subscription campaigns”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Subscription campaigns
Subscription campaigns. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.11Lost property
+
Content focused on “Lost property”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Lost property
Lost property. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.12Tourist information
+
Content focused on “Tourist information”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Tourist information
Tourist information. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.13Notices in multiple languages
+
Content focused on “Notices in multiple languages”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Notices in multiple languages
Notices in multiple languages. Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.14Instructions during emergencies and evacuations
+
Content focused on “Instructions during emergencies and evacuations”, with essential information, a time reference and clear guidance for the people on site.
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Reduce ambiguity, communication delays and non-compliant behaviour.
Instructions during emergencies and evacuations
Instructions during emergencies and evacuations. Current status: caution notice active; follow the procedure shown on screen. Required action: check the rule and apply it before proceeding. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.15Urgent example
+
"Line 5 suspended between Central and Station. Use replacement bus service B5.".
How we set it up
We define the audience, the screens involved and the message duration. We prepare a visual template with a title, main content and a summary; we agree on who approves updates and when the content must be replaced.
The intended outcome
Guide the public quickly and ease the workload on staff.
Urgent example
Urgent example: "Line 5 suspended between Central and Station. Use replacement bus service B5.". Current status: service updated; check the destination, starting point and new directions. Required action: go to the new indicated point or choose the proposed alternative. Last updated: 10:35. Next check: 10:50.
Layout and data are adapted to your business.FROM CONTENT TO UPDATES
Editorial coordination.
Your sources.
We can start with materials and updates supplied by your coordinator. For this sector, sources to assess include WMS, TMS, transport systems or operations centres.
Automatic connections to business systems, APIs or sensors require project work: first, we check data accessibility, permissions, update frequency and behaviour when the source is unavailable.
For safety notices, the project complements the facility's existing channels and procedures: wording, priorities and responsibilities are defined with the relevant contacts.
Content in different languages is prepared and reviewed. Local playback of available materials and distribution across sites are defined according to the agreed configuration.
THE SERVICE WE BUILD WITH YOU
Project and content
Analysis of spaces, selection of messages, visual templates and an initial demo sequence.
Configuration and trial
Screen checks, scheduling, editorial roles and testing of the agreed workflow.
Ongoing management
Updates, new productions and support within a defined service scope.
YOUR NEXT SCREEN
Let's start with
a practical need.
A place, an audience, a message.
That is where we start building your project.